VOLTSTREAM
Concept illustration of a data centre beside high-voltage transmission infrastructure
ENERGY MEETS OPPORTUNITY

Poweringintelligence,sustainably.

We develop grid-connected energy and AI infrastructure in Australia — making the most of the networks we already have, for a cleaner digital future.

Concept illustration
ABOUT VOLTSTREAM

Built around
the grid.

Australia's AI and digital economy is growing faster than its electricity network can connect new load. In New South Wales alone, data centre connection enquiries now exceed 20 GW — around double the state's peak demand — and capacity across the Sydney basin is effectively committed.

Voltstream exists to close that gap. We originate and develop large-scale infrastructure at locations with existing high-voltage transmission, available land and fibre — including former coal-generation regions where the network was built for gigawatt-scale power flows. We secure the land, the grid connection and the approvals, then partner with investors, operators and hyperscale customers to deliver powered capacity, faster.

Grid-led siting

We start with transmission capacity, not land.

Energy + compute

Experience across battery storage, grid connection and data centre development.

Policy aligned

Our sites reflect NSW Government’s preference for regional, brownfield locations with spare network capacity.

Regional partnership

Long-term jobs, local supply chains and community benefit in the regions we invest in.

OUR MODEL

From transmission line
to powered campus.

High-voltage transmission and landGrid connection and substationPowered data centre campusAn integrated approach, from grid to compute
  1. 01

    Originate

    Identify land with direct access to high-voltage transmission, fibre and water, and secure site control.

  2. 02

    Connect & approve

    Lead grid-connection studies and agreements with network operators and planning approvals with government and community.

  3. 03

    Deliver & partner

    Deliver the substation and bulk power to the site boundary, and partner with data centre operators and hyperscale customers on powered-land, powered shell or fully built models.

FEATURED PROJECT

Mt Piper AI Data
Centre Precinct

Portland, NSW

1 GWProposed capacity
500 kVTransmission
~47 haSite size
Early development

A proposed up-to-1 GW AI data centre campus beside the Mt Piper 500 kV transmission corridor in the Central Tablelands.

View the project
Concept illustration of a data centre campus in the Mt Piper landscape
Concept illustration — subject to approvals
LET’S COLLABORATE

Let’s build Australia’s
AI infrastructure together.

Get in touch

Investors & financiers

Early-stage entry into gigawatt-scale digital infrastructure.

Data centre operators & hyperscalers

Powered sites with a clear pathway to energisation.

Landholders

Partnerships on land near major transmission infrastructure.

Energy partners

Renewable PPAs, firming and storage to power our campuses.

FAQ

Your questions, answered.

What does Voltstream do?

We develop the land, grid connection and approvals for large-scale energy and AI data centre infrastructure.

Where do you operate?

We focus on Australian locations with existing high-voltage transmission, available land and fibre. Our featured Mt Piper project is in Portland, New South Wales.

How will your data centres be powered?

Through the grid, backed by long-term contracts for new renewable generation and storage, in line with the NSW Data Centre Guidelines.

How do you work with communities?

We engage early, prioritise local jobs and suppliers, and put in place long-term benefit-sharing.